Spaulding Rehabilitation Hospital

| Kathy Fyfe

Marr’s Aerial Lift Division installed 527 linear feet of suspended staging for use by the exterior trades on the new Spaulding Rehabilitation Hospital building.  The suspended staging consisted of 19 units of various sizes, the longest being 56 feet and the shortest being just five feet. The versatility of the suspended scaffold system allowed the exterior of the building to be accessed by multiple trades in different area at the same time.