Kyle Dupell, Integrated Project Solutions

Marr Scaffolding Company’s Shoring Division has installed two pre-engineered platforms for use by Integrated Project Solutions at the Lonza Biologics Facility in Portsmouth, NH. Project Manager Chris Madden and Foreman PJ Welch ensured a successful two-week installation of the 25-foot and 50-foot loading platforms. Shoring will remain on site for the 24 month rental with regular inspections.

Kyle Dupell, Program Project Engineer at IPS, had this to say about Marr’s work: 

“Not only did Marr work extensively with our on-site team to meet a critical deadline, they were flexible with their work hours and crew size. In addition to the flexibility and quality work the Marr team displayed, they did so with safety as the foremost important factor.

“We at IPS intend to continue to work with Marr for the duration of our time here on the Portsmouth project and on additional projects in the future… Thank you for your exceptional performance and look forward to a long lasting professional relationship with Marr in the future.”